PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed temporary lighting and power at the 3rd Floor Facing North-East (800x600).jpg Poured the concrete slab on deck at the 2nd Floor Facing East (800x600).jpg Pouring the concrete slab on deck at the 2nd Floor Facing North (800x600).jpg Repairing the Main steel column at the Monumental Stairs Facing East (800x600).jpg Repairing the main stell column at the Monumental Stairs Facing South (800x600).jpg
Previous page Repairing the main stell column at the Monumental Stairs Facing South (800x600)
Repairing the main stell column at the Monumental Stairs Facing South (800x600)